Engineered construction solutions for the “human element.”

Image of underwater boom installation on Grand Lake in Colorado

Debris Boom Installation

In order to protect dam infrastructure from fire debris run-off and accumulation, the Northern Colorado Water Conservancy District contracted Meridiam Partners to install underwater debris booms across the outlet structures at two locations in Willow Creek Reservoir and one location in Grand Lake.

Learn More

Aerial image of a terraced West Sopris Coal Mine Refuse Pile near Trinidad Colorado

West Sopris Coal Mine

The Colorado Division of Reclamation, Mining, and Safety (CDRMS) contracted Meridiam Partners to reclaim two coal refuse piles at an inactive mine near Trinidad, Colorado.

Learn More

Image of a Cameron Peak Watershed mitigation structure

Eagle Mine Superfund Site – Pond Relining and Pipe Removal

In the fall of 2021, Meridiam was contracted to remove existing pond sludge for treatment pond relining at the water treatment plant in addition to removal of old water transmission lines delivering water from the Eagle Mine to the treatment facility.

Learn More

image shows piece of equipment being unloaded from a semi truck

Calumet Refinery Remediation

Under a Corrective Action Order from the Montana Department of Environmental Quality, Meridiam Partners was contracted to remediate two contaminated areas at an oil and gas refinery in Great Falls, Montana.

Learn More

Image of a Cameron Peak Watershed mitigation structure

Pitch Mine Reclamation

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

Learn More

Image of a Cameron Peak Watershed mitigation structure

City of Greeley Watershed Damage Mitigation

Meridiam Partners was contracted by the City of Greeley’s Water and Sewer Department to mitigate damages to their watershed from the 2020 Cameron Peak Fire.

Learn More

Image of a Cameron Peak Watershed mitigation structure

Revenue-Virginius Mine Airline Installation

Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.

Learn More

Image of a Cameron Peak Watershed mitigation structure

Incline Lake Dam Demolition

Incline Lake was a small reservoir upstream of Lake Tahoe, Nevada. It was owned by the USDA Forest Service who decided to decommission the lake and restore its natural stream path in 2020.
Meridiam Partners was contracted by the USDA Forest Service to remove the lake’s main dam and an auxiliary dam.

Learn More