Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

4
5

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.

Upper Quarry Reclamation

The upper quarry at the Pitch mine site was used to source rock for various construction projects around the site. It was used one last time to obtain riprap material for the Tie Camp and Indian Creek Diversions project and then was reclaimed for closure. The reclamation of the site included grading the site to allow for stable slope, creating necessary channels for drainage, placing growth media, and finally seeding with hydro mulch. The total area reclaimed was approximately three acres.

Tie Camp and Indian Creek Diversions

The Tie Camp and Indian Creek diversions were designed to bypass the existing corrugated metal pipes. The construction of the new drainage consisted of a lined riprap channel, culverts, and plunge pools. The new drainage system measures 4,900 feet in total length with an elevation drop of almost 300 feet.

Other miscellaneous reclamation activities included:

  • Demolition of a water treatment plant.
  • Fill-in of a one-acre area of the Indian Rock Dump that was ponding.
  • Regrading and reseeding of three acres of two material stockpiles.
  • Revegetation of 12 acres of the south pit slide area.

Related Projects

Eagle Mine Superfund Site – Pond Relining and Pipe Removal

Eagle Mine Superfund Site – Pond Relining and Pipe Removal

Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.
Revenue-Virginius Mine Airline Installation

Revenue-Virginius Mine Airline Installation

Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.
West Sopris Coal Mine Refuse Pile Reclamation

West Sopris Coal Mine Refuse Pile Reclamation

The Colorado Division of Reclamation, Mining, and Safety (CDRMS) contracted Meridiam Partners to reclaim two coal refuse piles at an inactive mine near Trinidad, Colorado.
Ouray Silver Mines– Winter Road Maintenance

Ouray Silver Mines– Winter Road Maintenance

Meridiam Partners was contracted to provide snow removal and road maintenance on County Road 361 to Ouray Silver Mines just outside of Ouray, Colorado for the winter months.
Eagle Mine Superfund Site

Eagle Mine Superfund Site

Ramboll contracted with Meridiam Partners in May of 2018 to remove and replace an HDPE pond liner in Treatment Pond Cell #2, at the Eagle Mine Superfund Site near Minturn, Colorado.  The lined pond is part of the treatment plant facility that removes heavy metals from mine waters discharging from the Eagle Mine.