Meridiam was contracted to remove existing pond sludge for treatment pond relining at the water treatment plant.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam was contracted to remove existing pond sludge for treatment pond relining at the water treatment plant.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam was contracted to remove existing pond sludge for treatment pond relining at the water treatment plant.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam was contracted to remove existing pond sludge for treatment pond relining at the water treatment plant.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam was contracted to remove old water transmission lines delivering water from the Eagle Mine to the treatment facility.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam was contracted to remove old water transmission lines delivering water from the Eagle Mine to the treatment facility.

Image of underwater boom installation on Grand Lake in Colorado

Meridiam was contracted to remove old water transmission lines delivering water from the Eagle Mine to the treatment facility.

4
5

In the fall of 2021, Meridiam was contracted to remove existing pond sludge for treatment pond relining at the water treatment plant in addition to removal of old water transmission lines delivering water from the Eagle Mine to the treatment facility.

Related Projects

Revenue-Virginius Mine Airline Installation

Revenue-Virginius Mine Airline Installation

Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.
Pitch Mine Reclamation

Pitch Mine Reclamation

Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.
Calumet Refinery Remediation

Calumet Refinery Remediation

Under a Corrective Action Order from the Montana Department of Environmental Quality, Meridiam Partners was contracted to remediate two contaminated areas at an oil and gas refinery in Great Falls, Montana.
West Sopris Coal Mine Refuse Pile Reclamation

West Sopris Coal Mine Refuse Pile Reclamation

The Colorado Division of Reclamation, Mining, and Safety (CDRMS) contracted Meridiam Partners to reclaim two coal refuse piles at an inactive mine near Trinidad, Colorado.
Ouray Silver Mines– Winter Road Maintenance

Ouray Silver Mines– Winter Road Maintenance

Meridiam Partners was contracted to provide snow removal and road maintenance on County Road 361 to Ouray Silver Mines just outside of Ouray, Colorado for the winter months.
Eagle Mine Superfund Site

Eagle Mine Superfund Site

Ramboll contracted with Meridiam Partners in May of 2018 to remove and replace an HDPE pond liner in Treatment Pond Cell #2, at the Eagle Mine Superfund Site near Minturn, Colorado.  The lined pond is part of the treatment plant facility that removes heavy metals from mine waters discharging from the Eagle Mine.
Granby Dam Flume Replacement

Granby Dam Flume Replacement

The flume replacement project near the base of Granby Dam was awarded to Meridiam Partners after submission of a Statement of Qualifications, proposal and client interview with the Northern Colorado Water Conservancy District.
State Wildlife Area Flood Mitigation And Road Repair

State Wildlife Area Flood Mitigation And Road Repair

Meridiam Partners was awarded the contract to repair flood damaged roads at two State Wildlife Areas in Northeast Colorado for the Division of Parks and Wildlife, State of Colorado, Department of Natural Resources in May of 2018.