Beaver Creek State Wildlife Area – Diversion Installation

Image of Black Forest Regional Trail with erosion damage

Meridiam Partners constructed a water diversion and headgate structure for the Colorado Department of Parks and Wildlife at the Beaver Creek State Wildlife Area near Penrose, Colorado.

Image of Black Forest Regional Trail with erosion damage

Meridiam Partners constructed a water diversion and headgate structure for the Colorado Department of Parks and Wildlife at the Beaver Creek State Wildlife Area near Penrose, Colorado.

Image of Black Forest Regional Trail with erosion damage

Meridiam Partners constructed a water diversion and headgate structure for the Colorado Department of Parks and Wildlife at the Beaver Creek State Wildlife Area near Penrose, Colorado.

Image of Black Forest Regional Trail with erosion damage

Meridiam Partners constructed a water diversion and headgate structure for the Colorado Department of Parks and Wildlife at the Beaver Creek State Wildlife Area near Penrose, Colorado.

4
5

Meridiam Partners constructed a water diversion and headgate structure for the Colorado Department of Parks and Wildlife at the Beaver Creek State Wildlife Area near Penrose, Colorado.  Work included concrete structure and headgate placement in an active stream environment.

Related Projects

Incline Lake Dam Demolition

Incline Lake Dam Demolition

Meridiam Partners was contracted by the USDA Forest Service to remove Incline Lake’s main dam and an auxiliary dam.
City of Greeley Watershed Damage Mitigation

City of Greeley Watershed Damage Mitigation

Meridiam Partners was contracted by the City of Greeley’s Water and Sewer Department to mitigate damages to their watershed from the 2020 Cameron Peak Fire.
East Troublesome Fire Debris Boom Installation

East Troublesome Fire Debris Boom Installation

In order to protect dam infrastructure from fire debris run-off and accumulation, the Northern Colorado Water Conservancy District contracted Meridiam Partners to install underwater debris booms across the inlet structures at two locations in Willow Creek Reservoir and one location in Grand Lake.
City of Loveland – Idylwilde Park Pipe Deconstruction

City of Loveland – Idylwilde Park Pipe Deconstruction

In the Fall of 2019, Meridiam was contracted to remove and rehabilitate an existing hydroelectric pipeline on U.S.F.S. property through the City of Loveland.
Flooded Wetland Construction

Flooded Wetland Construction

In 2017, Meridiam Partners constructed a flooded wetland habitat for agriculture and waterfowl at the Double K Ranch near Fort Morgan, Colorado.
Engineering And Water Resource Development

Engineering And Water Resource Development

In 2018, Meridiam Partners was contracted under a Master Services Agreement to provide water resource engineering and construction on a property near Windsor, Colorado.