Ouray Silver Mines– Winter Road Maintenance
Meridiam Partners was contracted to provide snow removal and road maintenance on County Road 361 to Ouray Silver Mines just outside of Ouray, Colorado.
Related Projects
Eagle Mine Superfund Site – Pond Relining and Pipe Removal
Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.
Revenue-Virginius Mine Airline Installation
Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.
Pitch Mine Reclamation
Meridiam Partners was contracted to perform several reclamation activities at the Pitch Mine near Sargents, Colorado.
West Sopris Coal Mine Refuse Pile Reclamation
The Colorado Division of Reclamation, Mining, and Safety (CDRMS) contracted Meridiam Partners to reclaim two coal refuse piles at an inactive mine near Trinidad, Colorado.
Eagle Mine Superfund Site
Ramboll contracted with Meridiam Partners in May of 2018 to remove and replace an HDPE pond liner in Treatment Pond Cell #2, at the Eagle Mine Superfund Site near Minturn, Colorado. The lined pond is part of the treatment plant facility that removes heavy metals from mine waters discharging from the Eagle Mine.