State Wildlife Area Flood Mitigation And Road Repair

Image of Black Forest Regional Trail with erosion damage

Meridiam Partners repaired flood damaged roads at two State Wildlife Areas in northeast Colorado.

Image of Black Forest Regional Trail with erosion damage

During the summer of 2018, Meridiam Partners rebuilt a road accessing the Tamarack Ranch Sate Wildlife Area in Northeastern Colorado.

Image of Black Forest Regional Trail with erosion damage

During the summer of 2018, Meridiam Partners rebuilt a road accessing the Tamarack Ranch Sate Wildlife Area in Northeastern Colorado.

Image of Black Forest Regional Trail with erosion damage

During the summer of 2018, Meridiam Partners rebuilt a road accessing the Tamarack Ranch Sate Wildlife Area in Northeastern Colorado.

Image of Black Forest Regional Trail with erosion damage

Meridiam also improved access roads in the Elliott State Wildlife Area.

4
5

Meridiam Partners was awarded the contract to repair flood damaged roads at two State Wildlife Areas in northeast Colorado for the Division of Parks and Wildlife, State of Colorado, Department of Natural Resources in May of 2018.

The project consisted of topsoil stripping, regrading and surfacing approximately 42,000 lineal feet of gravel road. Additional wet/soft areas were excavated and backfilled with recycled concrete aggregate base course to create stability in some sections of the grade.

As aggregate pricing in the local area was high, Meridiam provided a value engineering approach with the State of Colorado and found a natural aggregate source near the project. By crushing and screening the specification base course required for the project, Meridiam was able to give the State of Colorado a refund back on the project.

With this additional money, the Division of Parks and Wildlife extended the contract and had Meridiam crews install an access bridge across the Tremont Ditch in the JK Tool State Wildlife Area. Meridiam provided the State with several bridge options and costs to install. Once an option was chosen, Meridiam provided all engineering and construction of the access bridge.

The project was completed on time, within budget and with no change orders.

Related Projects

Eagle Mine Superfund Site – Pond Relining and Pipe Removal

Eagle Mine Superfund Site – Pond Relining and Pipe Removal

Meridiam Partners was contracted to remove and replace 7,500 LF of mixed-diameter steel compressed air supply line with 7,500 LF of 10" butt-fused HDPE line. The project included numerous branches and associated fittings, valving, reductions, etc.
Calumet Refinery Remediation

Calumet Refinery Remediation

Under a Corrective Action Order from the Montana Department of Environmental Quality, Meridiam Partners was contracted to remediate two contaminated areas at an oil and gas refinery in Great Falls, Montana.
Granby Dam Flume Replacement

Granby Dam Flume Replacement

The flume replacement project near the base of Granby Dam was awarded to Meridiam Partners after submission of a Statement of Qualifications, proposal and client interview with the Northern Colorado Water Conservancy District.